Mumias sugar does cogeneration and supports fully is power requirement, when in operation with an excess of up to 4MW being exported to KPLC. This is being worked on to attain a peak of 26MW, on completion of the on going Cogen project. There are three main steps involved in cogen power production and these can be summed up in the following block diagram:
|